.................................. Return to Sumner's Home Page....
Return to N Scale RR Main Menu........... Return to Building UP's Canyon Division Menu
=========================================
...............Previous Page.............................Next Page If There Is One
=========================================
….............................--- Sawmill Design/Build – Part 23 ---
.................--- Sawmill Assembly Pt. 1 ---
=========================================
Starting the assembly of the mill's main building. I felt the walls were to short on my first go around after seeing how tall the real band saw was. Raise all the walls and also added a footer around the bottom of the wood sided walls. That resulted in changes to the green chain and the roof supports for it and a number of other items also needed changing like the loading docks and such.
In the pictures that follow the walls have be CA glued together. The interior detail that is shown is only sitting there and I'll probably never attach it to the floor very securely so that I can remove it for painting and maybe making changes to it. The same with the floor that is there. It lays in place for easy removal.
Printing the other floor as I type this. Also the roof will lift off to see the interior and also the side wall to the right above can be slid up and out to see the interior better.
.
.
.
Time to start painting, lots of it and will do a lot of the detailed parts later.
=========================================
A link to this whole build ( HERE ).
=========================================
...........................On..............e.........Next Page If There Is One